Morton District 709 Providing an education to last a life time.

Contact Numbers:

School Office

Phone: 1.309.266.7182

Fax: 1.309.263.2168

Absence: 1.309.263.0611

Search

Loading

The Latest:

 

Parent iPad Help

 

 

 

 

 

iPad Questions?
Request Form

 

Apple ID Questions?

Email [email protected].  Include your first and last name and DOB.

 

Transcript Request Form

 

 

Daily Announcements


Click for Morton, Illinois Forecast 


January 2018  Communicator 

 

January Newsletter

 

Annual Report

 



 Security Update 

 

School Safety Form

 

Counseling on Facebook


Morton 709 Water Mitigation Update

Starting on October 24th, 2017, and in compliance with Public Act 099-0922, all Morton District 709  facilities built prior to January 1, 2000, where pre-K through fifth grade students are present, were tested for lead in the water.  The testing was performed by Ideal Environmental Engineering, Inc.  As required by the act, the results of the testing were shared with the Illinois Department of Public Health (IDPH).  The level requiring action, recommended by the US Environmental Protection Agency, for school outlets is 20 parts per billion (ppb).  However, the IDPH mitigation requirements are significantly more stringent.  IDPH has set a minimum laboratory detection limit at 2 ppb.  

As required by the act, results were posted on the district website (www.Morton709.org) for public viewing.  In addition, any building with a level greater than 5 ppb, parents were notified individually in writing, which is also required under the act.

Morton District 709  administration and maintenance staff have been in contact with both IDPH and IDEAL Environmental Engineering.  Based on recommendations provided by both, mitigation and water management efforts have been implemented.  Many of the identified areas were sinks not used for food preparation or drinking.  No drinking fountains were affected. Any sinks identified over 2 ppb are now being used for handwashing only. All affected areas have been mitigated and will be retested.

Mitigation efforts

  • Kitchen faucets have been replaced
  • 8 drinking fountains replaced with new fountains that are filtered
  • Aerators removed
  • Systems flushed
  • Retesting will be completed January 30th

Costs

  • Testing/Retesting costs- $19,400
  • Faucet/Fountain costs- Roughly $15,000 (including labor)

Future plans

Morton District 709 remains committed to protecting student health and will continue to take all actions necessary.

Contacts:

    Principal Michael Gourley email
Asst. Principal Kirk Edwards email
Asst. Principal Deidre Ripka email
Athletic Director Scott Jones email

Contact List

 

Webmaster:

If you have information you would like to have added or updated, please contact the webmasters.  Email

 

MHS Spirit and Apparel Store

Please click on the link below to order MHS apparel from a new online spirit shop that donates a percentage of sales to ...

Web Designers in Peoria